Plumbing installation in your store or your business
For your store plumbing installation, POUPALOS BROS Co. follows the same basic methods and techniques performed in homes, having a fully organized team of licensed plumbers, equipped with latest tools and high tech materials.
There are particular cases where specialized equipment and particular plumbing infrastructure is required for the installation (hair salons, bakeries, laundries, etc.) We have the expertise and can implement modern techniques to provide the best solution for your business.
With extensive experience in plumbing installations our company will carry out all works required in the best way to deliver a complete plumbing installation quickly and efficiently, meeting all functional and aesthetic requirements.
During the development of the project, our crews apply innovative techniques using specialized tools and top quality materials, so as to deliver optimal results, technically and aesthetically, such as:
- Use of Cross Linked Polyethylene pipes from REHAU Company for plumbing and heating for maximum durability and functionality without soldering.
- High quality water supply and heating panelscollectors for autonomy and easy maintenance.
- Use of wet diamond drilling machine for opening holes at concrete at the points where the pipes for drainage and other use will go/pass through.
- Underfloor heating installation in a meander-shape pattern using the REHAU boards vario system
- Piping tightness testing by applying high pressure using special water press.
- All tubes that will be used later for radiators’ installation come out from the wall rather than the floor for aesthetic superiority and cleaning easiness.
- Lifetime electronic file compliance of plumbing installation with photos and plots.
With appropriate training, support and supervision, our technicians follow technically sound methods for plumbing installation in a coordinated and efficient manner.
Briefly, the stages of plumbing installation, as performed by our crew are as follows:
- Preparation during the foundation stage.If possible, we construct an underground drainage network within the basement’s concrete leaving openings in the slab of every floor facilitating upcoming piping routing.
- Water supply installation.After brickwork completion and in accordance with the plumbing drawings we install the water supply piping distribution network using either copper pipes or Cross Linked Polyethylene pipes from REHAU Company, place the water supply panels and finally check installation tightness using a special water press.
- Drainage network installation.Drainage includes the installation of wastewater and rainwater network, local drains of toilets and kitchens and floor waste traps.
- Heating network installation.When plastering is completed, we install the piping heating network that will supply the radiators and the central heating columns with water running all necessary tests.
- Installation completion.In the final stage of your office construction, we place sanitary ware and heating radiators, giving great attention to aesthetic detail and functionality always according to your requests and needs.We install the boiler room equipment and make all necessary arrangements and tests in order to have the entire installation ready for use.